STEP #1:
Insert A-frame gable supports (Part L) into
top of corner stands (Part C and Part D) and
center stands (Part G). Slide ends of tubing
down as far as possible.
|
STEP #2: Install the two-way end clamps (Part M) at
the center of each A-frame gable support
(Part L) that rests on corner stands (Fig 1).
If installing on a 10' or 15' long kennel, install
three-way center clamp (Part N) at the
center of A-frame gable supports that rests
on center stands (Fig 2). Center ridge pole
(Part O) between A-frame gable supports and
tighten (Fig. 3). |
STEP #3:
Unfold kennel cover material and drape over
kennel cover frame. Secure with elastic tie
downs (Part P - not shown).
Hint! Avoid over stretching the tie downs as
it could cause damage to grommets.
|